Actions on Enhancement of Emergency Preparedness

Near-term Actions (2011, 2012)

6.1. Development of technical requirements to design estimate documentation of the mobile control points (mobile communication points) for emergency operations leaders and NPPEA Team leader (completed in the 4th quarter of 2012).

6.2’. Development of designs of the unified radio communication system (completed in the 4th quarter of 2011).

6.2. Establishment of the unified radio communication system using the TETRA standard at Kalinin (completed in the 4th quarter of 2012).

6.6’. Development of technical requirements to backing up the data communication software engineering complex (completed in the 4th quarter of 2011).

6.8’. Analysis of the status of power supply of the communication points of the NPPs, Rosenergoatom secure emergency action control point and crisis center (completed in the 4th quarter of 2011).

Medium-term Actions (2013, 2014)

6.3. Establishment of the unified radio communication system using the TETRA standard at the remaining NPPS and Rosenergoatom crisis center (completed in the 4th quarter of 2014).

6.6. Development of designs to back up the data communication software engineering complex from the NPPs to Rosenergoatom crisis center and secure emergency action control point (completed in the 4th quarter of 2013).

6.8. Establishment (upgrading) of the secure and uninterrupted power supply system of the NPP communication centers, Rosenergoatom crisis center and secure emergency action control point (completed in the 4th quarter of 2014).

Long-term Actions (2015, 2016)

6.4. Based on technical requirements, establishment (upgrading) of the mobile control points (mobile communication points) at the NPPs and Rosenergoatom crisis center (ongoing, to completed in the 4th quarter of 2016).

6.5. Establishment of redundant digital communication channels between the NPPs and Rosenergoatom secure emergency action control point (completed in the 4th quarter of 2015).

6.7. Implementation of designs to back up the data communication software engineering complex from the NPPs to Rosenergoatom crisis center and secure emergency action control point (to be completed in the 4th quarter of 2016).